Joined: 28 Aug 2006 Posts: 12 Location: South America
Posted: Thu Sep 07, 2006 1:55 pm Post subject: Rough-in Framing: Construction Waste
I'm a member of a team in charge of the construction of a Green Home Building. We have a very tight budget, that's why we like to have all the information to the upmost detail. Which would be a reasonable or minimum percentage of construction waste regarding rough-in frmaing that we should take into account?